What is the solution? Understand the #1 reason the flooring contractor will walk off the job at the eleventh hour. The construction process, as it relates to slab flatness, does not work for the concrete pourer or the flooring contractor. Section 03-54-16 'Hydraulic Cement Underlayment', is conspicuously missing when it is needed just before the floor installation is scheduled so that slab creep, curl and deflection (sag) can be properly addressed as a billable extra prior to flooring installation. With this done the floor covering manufactures spec of 3/16" over 10' can be met. This disconnect between the concrete trade (Division 3) and floor covering trade (Division 9) ensures the opposite and results in delays, onsite and court room battles, failed flooring and clients left with second rate products. If you've dealt with situations like this and want know why, follow this link to an informative article on the topic: https://lnkd.in/gWHSMAt
|